Monday, September 23, 2024 - 2:49 pm
HomeLatest Newswork will start soon

work will start soon

Construction work is expected to begin next September. Widening of the sidewalks on San Juan Bosco Street inside Iturrama Neighborhood. In August, the Local Government Council approved the award of works to the company Lacunza Hermanos SL for an amount of 223,238.72 euros, under the framework agreement for construction works rehabilitation of public spaces.

The whole action will cover two areas of Saint-Jean-Bosco Street: the northern area attached to the Rinaldi Group building block and the southern area around the intersection with Iturrama Street. In both areas, they will be executed sidewalk widening works Upstream of the intersections, actions will be carried out on pedestrian crossings and urban drainage systems will be modified.

The work should last around ten weeks, between September 9 and November 18. works During their implementation, they can generate specific incidents in traffic in the area.

In the Rinaldi Group environment, Action prioritizes pedestrian corridor along the right bank of the Saint-Jean-Bosco Street (north-south direction). This implies that the intersections with the streets of the Rinaldi Group at the ends of the existing triangular park area become raised pedestrian crossings, at the level of the advanced sidewalks, with ramps on the road surface and sidewalk projections in the two margins of the two areas.

It will be realized progress of the pedestrian crossing sidewalks of Rinaldi Street North and the pedestrian crossing on Rinaldi Street South will be eliminated in order to improve the pedestrian corridor that will be generated. The intersection of the pedestrian crossing with San Juan Bosco Street will be advanced on both sides. The underground parking access area It will be modified with an intersection with lowered curbs and hydraulic tile covering at the level of the current road.

In the area between the Rinaldi Group and the green zoneThe distribution of parking spaces will also be changed, which will be used for loading and unloading and parking for disabled people. On the other side of the green zone, parking spaces will pass through the reverse battery line. Motorcycle and bicycle parking spaces are available nearby. Finally, new lighting will be installed in the pedestrian crossings being renovated and the drainage system will be modified in the sidewalk overhangs and other places.

Actions at the intersection with Iturrama Street

Action around the intersection with Iturrama Street will include improving pedestrian crossings, moving motorcycle parking spaces and changing the regional urban transport stop. Progress will be made on the pedestrian crossing in the Saint-Jean-Bosco Street before the confluence with Iturrama Street and also the pedestrian crossing as soon as it joins Iturrama Street. Both are currently temporarily demarcated by paint and bollards.

Furthermore, Motorcycle parking spaces have been changed existing spaces in the eastern area, just before the intersection, and new spaces are installed in the northwest area. Motorcycle parking spaces are added in two “L”-shaped areas to the southeast of the project, on Iturrama Street. The Iturrama Street bus stop will be modified, moving the shelter and advancing the sidewalk in this area. The stop will be located in the right general traffic lane of the street.

The action is completed with the replacement of the sidewalk and the edges of the central island at the pedestrian crossing of the street. Iturrama and the installation of lighting in pedestrian crossings.

Source

MR. Ricky Martin
MR. Ricky Martin
I have over 10 years of experience in writing news articles and am an expert in SEO blogging and news publishing.
RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Recent Posts