Friday, September 20, 2024 - 12:30 pm
HomeLatest NewsThe second Puente Genil bridge will be 1.5 kilometers long, have two...

The second Puente Genil bridge will be 1.5 kilometers long, have two lanes and will cost less than 3 million

He mayorSergio Velasco, announced this Wednesday the promotion of a “Historic” project for Puente Genil: the construction of a second bridge for the municipality, thanks to the “commitmentthe vision and generosity of the First Vice President and Chief Infrastructure Officer of Provincial Council of CordobaAndres Lorite.

After several working meetings between the advisor and the first vice-president of the Provincial Council, the The provincial institution will undertake the drafting of the construction project of a second bridge in the urban areawhich will connect the Santo Domingo neighborhood with Miragenil, crossing the river through the area of ​​the Río de Oro and La Carraca orchards. To this end, the technical assistance work for the project led by the head of the road service of the Provincial Council of Córdoba, Mateo Navajas González de Canales, has begun.

“It’s a transformative action which will connect the last roundabout of the intersection between Andalucía Avenue and Teresa de Calcuta Street, with the last roundabout of Estepa Street in Miragenil (next to the La Palmera gas station). In addition, a roundabout connecting to the Río de Oro road is incorporated, which will completely improve access to the La Isla neighborhood,” Velasco stressed.

THE The infrastructure is approximately 1.5 kilometers long. and will be equipped with two ways for vehicle traffic, cycle paths and pedestrian sidewalks, which implies ensuring its full accessibility. The river crossing point is located upstream of the threshold of Obispo Island, connecting the bank known as Huertas de Castilla (old Torremembrillo beach) with the south bank in the area of ​​La Carraca.

The proposal for the second bridge in the urban area of ​​Puente Genil was already included in the initial approval of the General Urban Planning Plan what is approved in plenary session in 2011although it is not included in the 1991 Plan, currently in force. Therefore, procedures will begin to carry out a specific modification of the General Urban Plan that makes room for this infrastructure.

Image of the location of the bridge that will be built at Puente Genil

ABC

The municipal government of Pontano highlighted different benefits that this viaduct will offer: will improve mobility within the urban area; will mean a fuel economy for neighbors and reduce the carbon footprint; It will improve the connection with the villages of the south of the urban area or with the urbanization of San Luis; “It will be a development opportunity for Miragenil and will contribute to the protection of the historic center, from which “a large part of the transit traffic” to other areas will be eliminated.

Andrés Lorite stressed that “the writing of the project of the new bridge will be completed throughout first half of 2025” Furthermore, he added that “having a developed project will allow the mayor to seek the necessary financing with the collaboration of all the Administrations or to seek financial aid for its realization.”

Although still in an embryonic phase, the first forecasts of the project regarding the finalized route proposal indicate that the total cost of execution, including expropriations, will be less than 3 millionThe mayor assured that this figure makes the project perfectly viable, provided that there is the support of other Administrations to complement the municipal contribution.

Source

Maria Popova
Maria Popova
Maria Popova is the Author of Surprise Sports and author of Top Buzz Times. He checks all the world news content and crafts it to make it more digesting for the readers.
RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Recent Posts