Home Top Stories CHS authorizes almost two million for emergency works due to damage caused...

CHS authorizes almost two million for emergency works due to damage caused by DANA in Letur

19
0
CHS authorizes almost two million for emergency works due to damage caused by DANA in Letur

The president of the Hydrographic Confederation of Segura (CHS), Mario Urreagave green light for emergency work to recover the damage caused by the devastating DANA in the municipality of Letur in Albacete.

An intervention estimated at budget of 1,976,000 eurosafter reaching consensus during several technical meetings and visits that CHS staff made to the affected areas.

From the first moment, we have worked with local, regional and state governments to restore basic services. of the population and in the search for the missing”, they say from the CHS.

The actions will focus on the work to remove dredgers and repair the Letur stream pipeline, the restoration of service roads and sections of the stream, the removal of dredgers and the reconstruction of the Rambla de la Dehesa wall.

emergency work

After checking and evaluating all needs, the actions were declared emergency since in the event of a new episode of rain The damage could be amplified, affecting both the safety of people and property.

This cataloging will allow the Basin Agency to proceed with immediate repair of damage caused to property belonging to the General Administration of the State. “In parallel with these actions, the CHS is already working on technical analyzes which will make it possible to develop a flood risk improvement project as quickly as possible,” he acknowledged.

Finally, they assured that From the beginning, they informed the Letur City Hall of their desire to work in a coordinated manner with the City Hall. and other administrations in the recovery of the municipality after the serious episodes of flooding suffered. A coordination which they have extended to supply, sanitation and purification actions which can be the subject of direct aid and which, in coordination with the General Directorate of Water of the Government, is also in the process of being implemented. ‘analysis.

LEAVE A REPLY

Please enter your comment!
Please enter your name here