Work continues to transform the territories liberated from occupation into green energy zones.
Ekonomiyyat.az reports that the creation and reconstruction of new small hydroelectric power plants (KSES) is underway in this direction.
Thus, “Chaykend-2” KSES will be built by “Azerenergy”.
The institution signed a contract for construction works worth 16,763,385.11 manats.
In addition, on the orders of Azerenerji, reconstruction works will be carried out at the Takagaya and Aghchay KSESs.
In this regard, a contract worth 19,839,606.24 manats was concluded.