He chaos It’s guaranteed. He mayor of Pamplona, Joseba Asironordered the closed to traffic of one of the routes of avenue of Pius XIIfor the start of work on a sustainable corridor. It’s a job that not even neighbors nor the merchants asked. Rather, they criticized him for disappearance of parking spaces and for the inconvenience that the work will generate neighbors And customers of commercial establishments.
We remember, the mayor Assyron he insisted on raising the street Pius XIIwhich he already did himself during his previous stage as mayor. This is why the neighbors they wonder why they have to spend the money of all the inhabitants of Pamplona by producing a work less than six years after the previous ones, with the neighborhood opposition And commercial.
Likewise, the thousands of drivers that they use daily Pius XII As they head towards the center of town, they will see the road closed and how it will be reduced to just one traffic lane (once the work is completed), this is a street through which they pass daily dozens of ambulances and being one of main access arteries and departure from the city towards the A-21.
This way, from there Monday 25he Right Lane in the direction centerfrom the confluence with the street Peter I and the street Iturramawill be closed and you will only be able to circulate in the Left Lane I’m going out of town, so Municipal police It is recommended to use the public transport or the use of alternative detoursalready marked.
He road traffic head towards the center passing through Arostegui Avenue You must access via the Concepcion Benitez Street until reaching the Barañain Avenue. This avenue is also recommended for traffic arriving from Irunlarrea. For vehicles arriving from Navarre Avenuethe options are Barañain Avenue and the Iñigo Arista Street.
He public transport is also concerned, since the stop located in the avenue Pie XII 41which serves the lines L02, L04, L15, L18 And N01. This stop is temporarily moved, for the lines L04, L15, L18 And N01at the cat flap before the intersection with Iturrama; as for the line L2the stop is moved to the Iturrama Streetnear the junction with Painter Maeztu. Furthermore, during this phase, the pedestrian crossings of this section, more precisely, those located at numbers 43 and 39.
The conditions will last until the end of the month Decemberwhen the completion of first phase works, in the section located between Peter I And Iturrama. The work in this phase does not affect any area of loading and unloadingand will generate 500 square meters of new green spacessome of which have already been executed.
And after this section of work, that the neighbors from the rest of the long avenue, because they await their execution three additional zones: inside Hotel Blanca de Navarraafter the pedestrian crossing with Peter Izone 2, between the numbers 39 and 41 of the avenue of Pius XIIdirection of entry, where the parking spaces existing; and in green zone 3, at the intersection with the street Iturrama.
THE second phase work is planned for next year, between Navarre Avenue and the street Peter Iand the street Iturrama with the avenue of Sancho el Fuerte. The duration of this second phase will be two months. THE third phasein the month of Marchwill affect the street Sancho the Strong with The return from the castleand in April The fourth begins, which takes place between the army avenue And Sancho the Strongalready leaving town. THE fifth phase covers the month of Can to the middle June and it will affect the street Sancho the Strong to the confluence with the street La Riojaand the sixth and last, from the middle of June until the end of Julywill end from Rioja Street until Navarre Avenue.