Normal operation, Jasamarga stops engineering and then contraflow km 55 to km 65 in the direction of Cikampetek

While in the arterial road Kalimalang is still dominated by two-wheel travelers in H-2 EID. The traffic flow is also relatively overcrowded, though not as dense as H-3 EID or the top of the flow of houses. Many passengers who intentionally decided to travel at night to avoid the sun.

The departure from the toll Beakayu increased the volume of passengers of vehicles, which went to the northern coastline and towns in East Java and Central Java. Although solid, the conditions of transport flow are still relatively smooth.

Based on police monitoring in Mega Bekasi, from 18:00 to 22:00 WIB, there were around 8,000 two wheels and 5,000 four vehicles that exceeded the arterial road Kalimang.

Many bike passengers who wear complete equipment and cross the arterial street Kalimang are also from the monitoring. It is estimated that the number of passing vehicles will increase on Saturday morning, given that many workers were gone.

My name is Chirag Soni and I have done my master’s in journalism and mass communication at NYU in New York City, I have also been a columnist for many local newspapers with 9 years of experience.