The traffic pattern of 57 routes in Baku is temporarily modified and the operation of 15 routes is suspended.
Oku.Az reports that this was reported by the Azerbaijan Surface Transportation Agency (AYNA) under the Ministry of Digital Development and Transport.
It was reported that according to the change:
– The “28 de Mayo” Transportation Exchange Center has been designated as the last stop on three regular routes. Thus, the starting point of bus route No. 2 with the Baku International Bus Terminal Complex, No. 5 with the metro station “Nariman Narimanov” and No. 88 with the station “Darnagul” will be NMM “28 May”.
– The “Academy of Sciences” metro station has been designated as the last stop on seven regular routes. The departure stop is number 6, which is the “Azadlig Prospekt” station, number 10, which is the Yasamal Residential Complex (MIDA), number 18, which is the 9th microdistrict, number 31, which is the settlement from Badamdar, number 39, which is Yeni Yasamal residential area number 96, which is the Baku International Bus Station complex, Lokbatan settlement, the last stop of buses on route 125 is the “Academy” metro station of Sciences” will be
– “Ulduz” metro station is designated as the last stop of 12 regular routes. Muzaffar Hasanov Street (“Yeni Klinika”) was removed from the scheme of Route No. 36, which connects the Yeni Gunesli settlement with the metro, and the Keshla settlement was removed from the scheme of Route No. 38, which connects the University of Medicine and the metro. Route number 71 will connect the metro stations “Azadlig Prospekt” and “Ulduz”.
It starts with Balakhani (No. 105), Buzovna (No. 107 and 131), Bilgah (No. 172), Nardaran (No. 189), Ramana (No. 204), Mammadli (No. 217), Mashtaga (No. M8) Savalan settlements and urbanization (139) will be organized through Balakhani road.
– The last stop of four regular routes is Khatai metro station. Thus, lines 30 and 32 departing from Jamshid Nakhchivanski Street, lines 21 departing from “Ahmadli” station and lines 49 departing from Mehdi Huseynzade Street (school no. 68) will be the Khatai metro station.
– Route No. 13 connects the Baku International Bus Station complex with the transport exchange center “Ganjlik”, Route No. 15 connects the city of Keshla with Azer Manafov Street, Route No. 46 connects the city of Guneshli with Hamreylik Street, Route No. 60 connects Polad Hashimov and Yavar Aliyev Street, Route No. 61 connects the 9th microdistrict of the capital with Rashid Behbudov (Central Bank) Street, Route No. 65 The 9th microdistrict will be connected with Azerbaijan Avenue, route number 70 will connect the hospital “AzerSuTikinti” with the metro station “Neftchilar” and route number 77 will connect the Yeni Yasamal residential area with Huseyin Javid Avenue (FHN).
– Route 120 covers the Hovsan residential complex (MIDA) and the “Hazi Aslanov” metro station, route 141 covers the Buzovna-Shuvelan highway and the Mardakan settlement, route 149 covers the Sahil settlement and the exchange center transport system “Lokbatan”, and route number 198 covers the Zabrat railway station and will link the Zabrat circle.
– Sabunchu railway station has been designated as the last stop on three regular routes (numbered 118A, 118B and 148) departing from the Zabrat settlement.
– The last stop of three regular routes is the Transport Exchange Center “Koroglu” (train station). Thus, the starting point of routes No. 163 with Ramana New Living Complex, No. 184 with the Surakhani settlement and No. 214 with the Ramana settlement (Shusha city) will be the southern exit of the “Koroglu” metro station (side ” Pyramid” ).
– Route 62 will connect Sabunchu settlement with Nasireddin Tusi street, route 93 will connect “Darnagul” metro station with Sabunchu settlement and route 166 will connect Jamshid Nakhchivanski street with Ramana settlement. Route activities will be organized through Balakhani highway.
– The last stop of three regular routes is assigned to the Zabrat district. Routes 173A and 173B leaving from the Pirshagi settlement and route 197 leaving from the Savalan residential area will be from the Zabrat district.
– Routes 40 and 55 connecting the settlements of Sabunchu and Guneshli will be organized along Asif Asadullayev and Yavar Aliyev streets.
– Route number 140 will connect the Shuvelan settlement with the “Ahmadli” metro station, and route number 160 will connect the Bina settlement with the “Hazi Aslanov” station. The buses will run on the Gala-Pirallahi road and the Zigh highway.
– The last stop on route no. 185, which starts from the Kurdakhani settlement, will be the “8th kilometer” market. The route activity will be organized by entering Asildar Mammadaliyev Street (Sabunchu Railway Station).
– Route No. 3 will connect the “Darnagul” metro station with the Badamdar settlement. The movement of buses from the settlement in the direction of the Badamdar Highway metro station, M. Mushfig Street, H. Javid Avenue, A. Hagverdiyev, Sh. Mehdiyev, H. Aliyev, S. Vurgun, H. Alasgarov, the Mardanov brothers and A. Bakikhanov streets, and later will be provided according to their own circulation scheme. In the opposite direction, the bus route will run along N. Yusifbeyli, S. Vurgun, H. Aliyev, Sh. Mehdiyev, A. Hagverdiyev and H. Javid Avenue, and then according to its own circulation scheme.
– Buses on route No. 17 connecting school No. 11 with the Yeni Yasamal residential area, Sh Mehdiyev, H. Aliyev, S. Vurgun, Mardanov brothers and A. Bakikhanov streets, and in the opposite direction, H. Alasgarov, S. Vurgun, Sh. Mehdiyev, A. .will move through the streets of Abbasov. The route will then operate according to its own schedule.
– 15 regular routes will be temporarily suspended (1, 4, 7B, 24, 37, 54, 140E, 141E, 150, 162, 168, 169, 205, 216 and 120E).