He Nicasio Landa Public School for Early Childhood and Primary Education, in the neighborhood of Échavacoiz He will change all the windows in the building as part of a project to improve the school’s facilities. This work consists of replacing the old windows of drink through new windows aluminum with double glazingwhich will provide better insulation and comfort.
This was approved by the Local Government Council of Pamplona, which authorized an expenditure of 46,709.63 euros (VAT included) and will be completed within one monthinvolves replacing old windows drink and blinds for new windows aluminum with double glazing.
Windows will be replaced in several locations, including the concierge area on the ground floor, as well as on the staff roomhe management officeTHE secretariat and a classroom on the first floor, as well as a classroom on the second floor.
The new windows will have a practical design, with fittings allowing them to be opened in different ways and will be fitted with decorative blinds. Other tasks will also be carried out, such as the reorganization of the wiring which is now passing through some windows, repair walls damaged during installation and paint affected areas.